SPX Quant Engine · Match Research Note · #1505461


◆ SPX Quant Forecast
Outcome Probabilities
Confidence 5 out of 5 confidenceGraded call · locked before kickoff
Home
Coquimbo Unido
2%
Draw
Draw
97%
Away
O'Higgins
1%
Model call: Draw
Probability Evolution
How model confidence shifts across the 8-stage match lifecycle
Coquimbo Unido
0
O'Higgins
0
Model called (T−24h)
Draw (97%)
Actually happened
Draw (97%)
Verdict graded against the T-24h locked probability. Click the stage tabs above to compare how the probability evolved.
Match Analysis
Timeline, stats, lineups, player ratings and AI insights — live during the match.
SPX xG
ⓘLineup Analysis
Starting XI not yet confirmed — lineups land roughly an hour before kickoff and this report updates automatically.
Post-Match Deep Analytics
Key absences, beyond-outcome calls and per-player tactical visuals — the shot-based panels finalize from official match data after full-time.
Shot-quality scatter · pass-success grid · key absences · expected shots · beyond-outcome calls — the full tactical deep-dive is a Premium feature →
Integrity Lock
This report's latest stage was generated at 2026-06-11T22:57:59.811Z and its canonical JSON hashed with SHA256. Each prior stage carries its own hash inside the corresponding tab so you can audit every step independently.
Stage hash ledger
| t48h | 2026-06-11T23:11:57.198Z | fcccb0086fdc40841fa08b0d262a162dfecd6a6e2bf61b17bd4b24ccb21b7916 |
| t24h | 2026-06-11T22:57:59.811Z | DEV-4.2-1505461 |
| preMatch | 2026-06-13T16:00:19.600Z | 42a8cb4d44e14c55ad4614b2ab6057ba7d13b65e1caa6def1a00ec0be1094bac |
| inPlayMin30 | 2026-06-13T17:00:03.868Z | c3e3cc77a6f56bc7dd2d8c0e63e44627a2c76649868044d3c2265bfd21e07ccf |
| halfTime | 2026-06-13T17:25:02.374Z | 794547dd16d2e764b5e3be23c80f91b60b62c45dc04325745649edac05eb4907 |
| inPlayMin60 | 2026-06-13T17:50:02.337Z | ecbdd4a4f9b8e668210e0f8cfdb278da9339af0e352ac843ad1617e1b55ba530 |
| inPlayMin75 | 2026-06-13T18:25:02.417Z | 82a9858b69f04f071351ada72a97f36981a5d4cda6a5abf49eeb9cca24dcfcb6 |
Model v4.2 · Public beta: every published forecast is timestamped and model-versioned. When the beta period ends (June 2027), per-fixture pre-kickoff forecasts become immutable under our SHA256 audit policy.