SPX Quant Engine · Match Research Note · #1505462


◆ SPX Quant Forecast
Outcome Probabilities
Confidence 5 out of 5 confidenceGraded call · locked before kickoff
Home
Concepción
94%
Draw
Draw
6%
Away
Deportes Limache
0%
Model call: Concepción
Probability Evolution
How model confidence shifts across the 8-stage match lifecycle
Concepción
3
Deportes Limache
2
Model called (T−24h)
Concepción (94%)
Actually happened
Concepción (94%)
Verdict graded against the T-24h locked probability. Click the stage tabs above to compare how the probability evolved.
Match Analysis
Timeline, stats, lineups, player ratings and AI insights — live during the match.
SPX xG
ⓘLineup Analysis
Starting XI not yet confirmed — lineups land roughly an hour before kickoff and this report updates automatically.
Post-Match Deep Analytics
Key absences, beyond-outcome calls and per-player tactical visuals — the shot-based panels finalize from official match data after full-time.
Shot-quality scatter · pass-success grid · key absences · expected shots · beyond-outcome calls — the full tactical deep-dive is a Premium feature →
Integrity Lock
This report's latest stage was generated at 2026-06-12T07:11:56.685Z and its canonical JSON hashed with SHA256. Each prior stage carries its own hash inside the corresponding tab so you can audit every step independently.
Stage hash ledger
| t48h | 2026-06-12T07:11:56.685Z | 4a39778e3166db8f6871815e98a9ddec1afd10d6e9c6b1a8817ac9594b42c7c4 |
| t24h | 2026-06-12T07:11:56.685Z | DEV-4.2-1505462 |
| preMatch | 2026-06-14T13:30:10.609Z | ce5ab30ee12cc045815847cfe476248b65bd58518109e7f38e5d60c0886ae3d0 |
| inPlayMin30 | 2026-06-14T16:55:02.940Z | e0efccd690848cab99c1226c6c3256c18107e492a2d13a111ce9c2bb699f208c |
| halfTime | 2026-06-14T17:25:03.125Z | 56c51435ec81a8b7c3f9175204c779aed1fe6945469af01b5a816b0585a9f9e2 |
| inPlayMin60 | 2026-06-14T17:45:02.411Z | d42302920dbcffeceb92e5cf3b5e6135f469e89bc8a086ee7c07b9dfd0690031 |
| inPlayMin75 | 2026-06-14T18:15:05.435Z | 9af39350ddfa8d714c81654bd15eee134ad74d0c886111e8ef12b0098257edf5 |
Model v4.2 · Public beta: every published forecast is timestamped and model-versioned. When the beta period ends (June 2027), per-fixture pre-kickoff forecasts become immutable under our SHA256 audit policy.