SPX Quant Engine · Match Research Note · #1505464


◆ SPX Quant Forecast
Outcome Probabilities
Confidence 5 out of 5 confidenceGraded call · locked before kickoff
Home
Nublense
0%
Draw
Draw
2%
Away
Huachipato
98%
Model call: Huachipato
Probability Evolution
How model confidence shifts across the 8-stage match lifecycle
Nublense
2
Huachipato
2
Model called (T−24h)
Huachipato (98%)
Actually happened
Draw (2%)
Verdict graded against the T-24h locked probability. Click the stage tabs above to compare how the probability evolved.
Match Analysis
Timeline, stats, lineups, player ratings and AI insights — live during the match.
SPX xG
ⓘLineup Analysis
Starting XI not yet confirmed — lineups land roughly an hour before kickoff and this report updates automatically.
Post-Match Deep Analytics
Key absences, beyond-outcome calls and per-player tactical visuals — the shot-based panels finalize from official match data after full-time.
Shot-quality scatter · pass-success grid · key absences · expected shots · beyond-outcome calls — the full tactical deep-dive is a Premium feature →
Integrity Lock
This report's latest stage was generated at 2026-06-11T22:58:26.477Z and its canonical JSON hashed with SHA256. Each prior stage carries its own hash inside the corresponding tab so you can audit every step independently.
Stage hash ledger
| t48h | 2026-06-11T23:12:16.664Z | 05b1c9fd72766747f4e582857208062fecc546ddf04fcc40211fdcd6a6c9ea1e |
| t24h | 2026-06-11T22:58:26.477Z | DEV-4.2-1505464 |
| preMatch | 2026-06-13T21:00:17.837Z | 9306a12527d72fe01c5c8c6035f7a065fb5fc93d8bb0beb514b8a8609717443f |
| inPlayMin30 | 2026-06-14T00:30:04.782Z | 7589bd0f934fcd4bb71605cde6df0bd060cfa76641f4c6b609ce720934582a77 |
| halfTime | 2026-06-14T00:55:02.271Z | 9fa3d9b4fb1b599ec84af5a211b52983c84b0528e194dfa68eb600414147e7e6 |
| inPlayMin60 | 2026-06-14T01:25:02.330Z | b03bfff4b263b186d01d910dde380dae7c9973b647173227e1e822620e827d9f |
| inPlayMin75 | 2026-06-14T01:50:02.112Z | a464a3cc90e5cfc43c39010c5debb2f2251e835c1f3f494fe1d6cf2d426c9c11 |
Model v4.2 · Public beta: every published forecast is timestamped and model-versioned. When the beta period ends (June 2027), per-fixture pre-kickoff forecasts become immutable under our SHA256 audit policy.