SPX Quant Engine · Match Research Note · #1518097


◆ SPX Quant Forecast
Outcome Probabilities
Confidence 3 out of 5 confidenceHome
Hoang Anh Gia Lai
22%
Draw
Draw
29%
Away
Ha Noi
49%
Model call: Ha Noi
Probability Evolution
How model confidence shifts across the 8-stage match lifecycle
Hoang Anh Gia Lai
3
Ha Noi
1
Model called (T−24h)
Ha Noi (49%)
Actually happened
Hoang Anh Gia Lai (22%)
Verdict graded against the T-24h locked probability. Click the stage tabs above to compare how the probability evolved.
Match Analysis
Timeline, stats, lineups, player ratings and AI insights — live during the match.
SPX xG
ⓘLineup Analysis
Hoang Anh Gia Lai
Player 359871
Player 531572
Player 531621
Player 9393
Player 531571
Player 531660
Player 531495
Player 531498
Player 268852
Player 89935
Player 531570
Ha Noi
Player 531641
Player 65000
Adriel
Player 64939
Player 531616
Player 198197
Player 531569
Player 531490
Player 171056
Player 159900
Player 104420
Both sides named an XI close to their recent baseline.
Post-Match Deep Analytics
Key absences, beyond-outcome calls and per-player tactical visuals — the shot-based panels finalize from official match data after full-time.
Lineup Absence Impact
Key absentees and how unbalanced the missing-star count is between sides.
Roster impact: roughly even
Hoang Anh Gia Lai · key absences
No notable absences reported
Ha Noi · key absences
No notable absences reported
Beyond Match Outcome
Forward-looking analytics on corners and cards — beyond the 1X2 result market.
Corners
Expected totalSPX commitment — no bookmaker odds shown
Cards
Expected totalSPX commitment — no bookmaker odds shown
Shot Creation Profile
Not enough recent-match history to build a shot-creation profile for these teams yet.
SPX Quant Engine
Shot Quality
Shot quality data unavailable for this fixture
SPX Quant Engine
Pass Network
Pass network data unavailable for this fixture
SPX Quant Engine
Integrity Lock
This report's latest stage was generated at 2026-06-09T02:36:46.517Z and its canonical JSON hashed with SHA256. Each prior stage carries its own hash inside the corresponding tab so you can audit every step independently.
Model v4.01 · Public beta: every published forecast is timestamped and model-versioned. When the beta period ends (June 2027), per-fixture pre-kickoff forecasts become immutable under our SHA256 audit policy.