Skip to main content
← All reports

SPX Quant Engine · Match Research Note · #1518102

V.League 1·
Thanh Hóa crest
Thanh HóaHOME
0:2
Match Finished
HT 0-1
Phu Dong crest
Phu DongAWAY
Sun, May 31 · 11:00 UTCSân vận động Thanh Hóa30°C◆ SPX ✓ Hit

◆ SPX Quant Forecast

Outcome Probabilities

Confidence 3 out of 5 confidence

Home

Thanh Hóa

21%

Draw

Draw

29%

Away

Phu Dong

50%

Model call: Phu Dong

Expected goals: 0.71.2(total 2.0)
Upset risk: 4/10

Probability Evolution

How model confidence shifts across the 8-stage match lifecycle

HomeDrawAway
25%50%75%48h24hPreXI30'HT60'75'
7 premium stages hidden — see the full trajectory through every information event.Upgrade
✓ HitFinal score · graded Jun 1

Thanh Hóa

0

FT

Phu Dong

2

Model called (T−24h)

Phu Dong (50%)

Actually happened

Phu Dong (50%)

Verdict graded against the T-24h locked probability. Click the stage tabs above to compare how the probability evolved.

Match Analysis

Timeline, stats, lineups, player ratings and AI insights — live during the match.

SPX xG

Lineup Analysis

Thanh Hóa

  1. Player 531668
  2. Player 531554
  3. Player 531553
  4. Player 531535
  5. Player 531585
  6. Player 531605
  7. Player 594172
  8. Player 531618
  9. Player 65027
  10. Player 653774
  11. Player 140836

Phu Dong

  1. Player 49356
  2. F. Friday
  3. Player 531589
  4. Player 65209
  5. Player 639590
  6. Player 531534
  7. Player 531657
  8. Player 531519
  9. Player 531632
  10. Player 531521
  11. Player 357938

Both sides named an XI close to their recent baseline.

Post-Match Deep Analytics

Key absences, beyond-outcome calls and per-player tactical visuals — the shot-based panels finalize from official match data after full-time.

Lineup Absence Impact

Lineup confirmed shortly before kickoff

SPX Quant Engine

Beyond Match Outcome

Predictions not yet available for this match

SPX Quant Engine

Shot Creation Profile

Not enough recent-match history to build a shot-creation profile for these teams yet.

SPX Quant Engine

Shot Quality

Shot quality data unavailable for this fixture

SPX Quant Engine

Pass Network

Pass network data unavailable for this fixture

SPX Quant Engine

Integrity Lock

This report's latest stage was generated at 2026-06-09T02:36:46.517Z and its canonical JSON hashed with SHA256. Each prior stage carries its own hash inside the corresponding tab so you can audit every step independently.

fe9e5fc95f8367bad8989e0c4d47a330309b3d03640463b5cc03e7c6e111aa19
✓ Hash verified — contents unchanged

Model v4.01 · Public beta: every published forecast is timestamped and model-versioned. When the beta period ends (June 2027), per-fixture pre-kickoff forecasts become immutable under our SHA256 audit policy.

Verify yourself via the API.