Skip to main content
← All reports

SPX Quant Engine · Match Research Note · #1534316

1. Division·
Gomel II crest
Gomel IIHOME
1:3
Match Finished
HT 0-0
FC Slutsk crest
FC SlutskAWAY
Sun, May 31 · 10:00 UTCCentralnyj Stadion◆ SPX ✓ Hit

◆ SPX Quant Forecast

Outcome Probabilities

Confidence 5 out of 5 confidence

Home

Gomel II

13%

Draw

Draw

15%

Away

FC Slutsk

72%

Model call: FC Slutsk

Expected goals: 0.41.5(total 1.9)
Upset risk: 3/10

Probability Evolution

How model confidence shifts across the 8-stage match lifecycle

HomeDrawAway
25%50%75%48h24hPreXI30'HT60'75'
7 premium stages hidden — see the full trajectory through every information event.Upgrade
✓ HitFinal score · graded Jun 1

Gomel II

1

FT

FC Slutsk

3

Model called (T−24h)

FC Slutsk (72%)

Actually happened

FC Slutsk (72%)

Verdict graded against the T-24h locked probability. Click the stage tabs above to compare how the probability evolved.

Match Analysis

Timeline, stats, lineups, player ratings and AI insights — live during the match.

SPX xG

Lineup Analysis

Gomel II

  1. Player 655090
  2. Player 563159
  3. Player 563253
  4. Player 422888
  5. Player 563085
  6. Player 563311
  7. Player 358614
  8. Player 311271
  9. Player 563209
  10. Player 563320
  11. Player 343377

FC Slutsk

  1. Nikita Robak
  2. Player 264162
  3. Player 7895
  4. Player 265409
  5. Player 563226
  6. Player 392056
  7. Player 7943
  8. Player 465485
  9. Player 311023
  10. Player 562175
  11. Player 76376

Both sides named an XI close to their recent baseline.

Post-Match Deep Analytics

Key absences, beyond-outcome calls and per-player tactical visuals — the shot-based panels finalize from official match data after full-time.

Lineup Absence Impact

Lineup confirmed shortly before kickoff

SPX Quant Engine

Beyond Match Outcome

Predictions not yet available for this match

SPX Quant Engine

Shot Creation Profile

Not enough recent-match history to build a shot-creation profile for these teams yet.

SPX Quant Engine

Shot Quality

Shot quality data unavailable for this fixture

SPX Quant Engine

Pass Network

Pass network data unavailable for this fixture

SPX Quant Engine

Integrity Lock

This report's latest stage was generated at 2026-06-09T02:36:46.517Z and its canonical JSON hashed with SHA256. Each prior stage carries its own hash inside the corresponding tab so you can audit every step independently.

f96a25a9c5d5a50ceb2a866eb1a2ed3f4e1a2eb61eca519c138ac3ffd0953067
✓ Hash verified — contents unchanged

Model v4.01 · Public beta: every published forecast is timestamped and model-versioned. When the beta period ends (June 2027), per-fixture pre-kickoff forecasts become immutable under our SHA256 audit policy.

Verify yourself via the API.