Skip to main content
← All reports

SPX Quant Engine · Match Research Note · #809388

Saint-Pierre Milizac vs Stade Briochin II — Match Report & Forecast Archive

National 3 - Group K·
Saint-Pierre Milizac crest
Saint-Pierre MilizacHOME
3:1
Match Finished
HT 1-0
Stade Briochin II crest
Stade Briochin IIAWAY
Sat, Feb 26 · 17:00 UTCStade Pen Ar Guéar N°19°CRefereeE. DouartSPX: Saint-Pierre MilizacHit
Share this cardDownload PNGPost on X →

◆ SPX Quant Forecast

Free account

Forecast archive — free with an account

The match facts on this page are public. The forecast archive behind this report — outcome probabilities, the stage-by-stage evolution and the graded detail — is free once you sign in.

Create a free account — unlock the full settled forecast archive: the stage-by-stage probability path, score distribution and graded record for every finished match.

◆ Similar Matches

historical record

Match Analysis

Timeline, stats, lineups, player ratings and AI insights — live during the match.

SPX xG

Lineup Analysis

Saint-Pierre Milizac

  1. Player 343796
  2. Player 194099
  3. Player 277181
  4. Player 84999
  5. Player 165503
  6. Player 22195
  7. Player 83840
  8. Player 179602
  9. M. Üçüncü
  10. Player 21343
  11. Player 22790

Stade Briochin II

  1. Player 277222
  2. Player 358213
  3. Player 174759
  4. Player 85303
  5. Player 85058
  6. Player 191257
  7. Player 287975
  8. Player 343806
  9. Player 161733
  10. Player 282569
  11. Player 343797

Both sides named an XI close to their recent baseline.

Post-Match Deep Analytics

Two lifecycle groups: pre-match signals (available before kickoff) and per-player analytics that finalize from official match data after full-time.

Integrity Lock

This report's latest stage was generated at 2026-06-09T02:36:46.517Z and its canonical JSON hashed with SHA256 — locked at lineup confirmation. Each prior stage carries its own hash inside the corresponding tab so you can audit every step independently.

e2a789bea9d5e4787d200e3f07dbce6060bba5332bad047ce08df564720299d1
✓ Hash verified — contents unchanged

Model v4.56 · Public beta: every published forecast is timestamped and model-versioned. When the beta period ends (June 2027), per-fixture pre-kickoff forecasts become immutable under our SHA256 audit policy.

Verify this report's SHA256 fingerprint →